BACHELOR OF INFORMATION
TECHNOLOGY & SYSTEMS
ITSU3009 ASSESSMENT GUIDE
BITS ITSU3009 ASSESSMENT GUIDE August 2020
(Revised and Updated Aug 2020)
2 BITS – ITSU3009
Assessment Overview
| Assessment Component |
Assessment Description | Weighting | Learning Outcomes |
| Assessment 1: Project Report -Detailed Systems Design Report |
This part of the project report is designed to improve student planning skills and to give students experience in researching a topic and creating a plan for the project. |
20% | 1, 2, 3, 4, 5 |
| Assessment 1: Project Report Implementation Report |
This assessment is designed to assess students on how they adopt a systematic approach to produce a quality system and use their problem solving skills to solve issues and manage risks during the implementation of a project. |
20% | 1, 2, 3, 4, 5 |
| Assessment 1: Project Report -Testing Report |
This assessment is designed to improve student’s testing skills and to give students experience in researching a topic and creating a plan for the project. |
20% | 1, 2, 3, 4, 5 |
| Assessment 1: Project Report – User Documentation |
In this component of the project report you will prepare user documentation for your project. The user documentation should be based on the system that you have designed and implemented earlier. In this assessment, you will be describing how your prototype operates. Your user document should be easy to understand and not confusing for the end user. |
10% | 1, 2, 3, 4, 5 |
| Assessment 2: Final Product Demonstration |
In Assessment 2 you will focus on project design with technical drawings and other project management information. |
20% | 1,2 |
| Assessment 3: Final Oral Presentation |
Assessment 3 is the oral presentation linked to Assessment 2. The marking criteria for both your fnal product demonstration and oral presentation can be found below. |
10% | 1, 3, 4 |
AssignmentTutorOnline
BITS – ITSU3009 3
Referencing guides:
You must reference all the sources of information you have used in your assessments. Please use the IEEE
referencing style. referencing style when referencing in your assessments in this unit. Refer to the Library’s
referencing guides for more information.
Academic misconduct:
VIT enforces that the integrity of its students academic studies follow an acceptable level of excellence. VIT will
adhere to its VIT Policies, Procedures and Forms where it explains the importance of staff and student honesty
in relation to academic work. It outlines the kinds of behaviours that are “academic misconduct”, including
plagiarism.
Late submissions:
In cases where there are no accepted mitigating circumstances as determined through VIT Policies, Procedures
and Forms, late submission of assessments will lead automatically to the imposition of a penalty. Penalties will
be applied as soon as the deadline is reached.
Short extensions and special consideration:
Special Consideration is a request for:
•Extensions of the due date for an assessment, other than an examination (e.g. Assessment extension).
•Special Consideration (Special Consideration in relation to a Completed assessment, including an
end-of-unit Examination).
Students wishing to request Special Consideration in relation to an assessment the due date of which has not
yet passed must engage in written emails to the teaching team to Request for Special Consideration as early as
possible and prior to start time of the assessment due date, along with any accompanying documents, such as
medical certifcates. For more information, visit VIT Policies, Procedures and Forms.
Inclusive and equitable assessment:
Reasonable adjustment in assessment methods will be made to accommodate students with a documented
disability or impairment. Contact the unit teaching team for more information.
Contract Cheating:
Contract cheating usually involves the purchase of an Assessment or piece of research from another party.
This may be facilitated by a fellow student, friend or purchased on a website. Other forms of contract cheating
include paying another person to sit an exam in the student’s place.
Contract cheating warning:
• By paying someone else to complete your academic work, you don’t learn as much as you could have
if you did the work yourself.
4 BITS – ITSU3009
• You are not prepared for the demands of your future employment.
• You could be found guilty of academic misconduct.
• Many of for pay contract cheating companies recycle Assessments despite guarantees of “original,
plagiarism-free work” so similarity is easily detected by TurnitIn.
• Penalties for academic misconduct include suspension and exclusion.
• Students in some disciplines are required to disclose any fndings of guilt for academic misconduct
before being accepted into certain professions (e.g. law).
• You might disclose your personal and fnancial information in an unsafe way, leaving yourself open
to many risks including possible identity theft.
• You also leave yourself open to blackmail – if you pay someone else to do an Assessment for you,
they know you have engaged in fraudulent behaviour and can always blackmail you.
Grades:
We determine your grades to the following Grading Scheme:
| Grade | Percentage |
| A | 80%-100% |
| B | 70% – 79% |
| C | 60% – 69% |
| D | 50% – 59% |
| F | 0% – 49% |
ASSESSMENTS
Assessment 1: Detailed Systems Design Report
Objective(s)
This assessment item relates to the unit learning outcomes as in the unit descriptor. This assessment is
designed to improve student Planning skills and to give students experience in researching a topic and
creating a plan for the project.
Instructions
These instructions apply to Assessment 1 – Detailed Systems Design Report
Assessment 1 – Detailed Systems Design Report (20% → 4% (Group) + 16% (Individual))
Due Date: Session 5
BITS – ITSU3009 5
For this component you will be required to address the Detailed Systems Design of your project. This
Assessment is the continuation of what you have done in project 1 Assessment 4.
Please extend your existing report (Project 1 Assessment 4) with more details about network architecture/
Architectural Diagram, Project flow chart, ER Diagram/Protocol and Technologies that you have used in
the project.
The report must follow the template provided on the LMS. Citation of sources is mandatory and must be in
the IEEE style.
What to submit:
Submit your report to the LMS in Turnitin dropbox. Note that this will be a turn-it-in drop box and as such
you will be provided with a similarity score. This will be taken into account when grading the Assessment.
Note that incidents of plagiarism will be penalized. If your similarity score is high you can re-submit your
report, but re-submissions are only allowed up to the due date. If you submit your Assessment after the due
date and time re-submissions will not be allowed.
Note: All work is due by the due date and time. Late submissions will be penalized at the rate of 10% per day
including weekends.
Submission Instructions:
The Assessor will assess you on the following
Discussion and participation:
a. Are made in a timely fashion, giving others an opportunity to respond.
b. Are thoughtful and analyse the content or question asked.
c. Pose new possibilities or opinions not previously voiced
d. Are ideas expressed clearly, concisely. Uses appropriate vocabulary. Is attentive to spelling and grammar.
e. Spend the time to construct creative, challenging and engaging discussions, which promote participation.
Marking Guide:100 Marks Weightage:20%
| Task | Description | Marks |
| Report Layout and Report Compilation |
The report style, language and structure should be appropriate. |
10 |
| Introduction | This section should include a few sentences which provide an outline of the assessment. |
5 |
| Detailed Network Architecture/ Architectural Diagram |
The projects in the networking stream are required to design and explain in detail about the network architecture. The projects in the application development stream are required to design and explain in detail about the architectural diagram. |
25 |
6 BITS – ITSU3009
| Task | Description | Marks |
| Detailed Project Flow Chart | Include detailed explanation on your knowledge and understanding about the project flow chart. |
20 |
| Detailed ER Diagram/ Protocols and Technologies |
Include detailed explanation of ER diagram for all application development streams and networking streams where applicable. Networking Projects where ER Diagram is not applicable students are required to discuss in detail on protocols and technologies used. |
20 |
| Critical Reflection | Critically reflect on the social, ethical and professional obligations associated to design, implementation and delivery of the project. Highlight the impact of the project on the society. |
10 |
| References | Follow the IEEE style | 10 |
Assessment 2: Implementation Report
Objective(s):
This assessment item relates to the unit learning outcomes specifed in the unit descriptor. This assessment
is designed to assess students on how they adopt a systematic approach to produce a quality system and
use their problem-solving skills to solve issues and manage risks during the implementation of a project.
Instructions:
Assessment 2 – Implementation Report (20% → 4% (Group) + 16% (Individual))
Due Date: Session 8
In this component you need to write a report about the implementation of your project. The implementation
should be based on the system design report that you have submitted earlier as Assessment 1. In this
Assessment, you will be implementing a prototype of a system that you have already designed and confgure
the protocols and technologies that you have proposed in your frst report.
In the implementation report, you must include the following items in detail:
• The step-by-step explanation of how you have confgured your system and all the related protocols and
technologies
• Screenshots of the commands and codes that you’ve used for confguration
• The issues and risks that you have faced during the implementation and how you have addressed them
• The contribution of each group member in building the prototype
The report must follow the template provided on the LMS. Please note that citation of sources is mandatory
and must be in the IEEE style.
BITS – ITSU3009 7
What to submit:
Submit your report on LMS using the Turnitin link created for Assessment 2. Note that your Assessment will
be checked by Turnitin and you will be provided with a similarity score. This will be considered when grading
the Assessment and the incidents of plagiarism will be penalized accordingly. If your similarity score is high,
you can re-submit your report, but re-submissions are only allowed until the due date. If you submit your
Assessment after the due date, re-submissions will not be allowed.
Note: All work is due by the deadline which is specifed on Moodle. Late submissions will be penalized at the
rate of 10% per day including weekends.
Marking Guide:100 Marks Weightage:20%
| Task | Description | Marks |
| Report Layout and Report Compilation |
The report style, language and structure should be appropriate. |
10 |
| Description of how the project has been implemented |
Include the step-by-step explanation of how you have confgured your system and all the related protocols and technologies |
30 |
| Usage of codes/commands | Include all the commands and codes that you’ve used in system confguration |
25 |
| Description of challenges and how they have been resolved |
Explain in detail the issues and risks that you have faced during the implementation and how you have addressed them |
30 |
| References | Follow the IEEE style | 5 |
Assessment 3: Testing Report
Objective(s):
This assessment item relates to the unit learning outcomes as in the unit descriptor. This
assessment is designed to improve student Planning skills and to give students experience in
researching a topic and creating a plan for the project.
Instructions:
Assessment 3 – Testing Report (20% → 4% (Group) + 16% (Individual)) Due Date: Session 12
8 BITS – ITSU3009
In the testing report, you must include the following items in detail:
• Expected output from the implementation
o In this section, you will discuss briefly about the expected output from the implementation.
• Testing criteria
o In this section, you will discuss about the testing criteria you have considered to verify the success
of your project.
o Step by step explanation of how you have tested your system (you can use screenshots as the evidence).
• Results
o In this section, you will provide and explain the screenshots of the result you have received in the project.
• Conclusion
o Conclude with your opinion about the results.
This report must follow the template provided on the LMS. Please note that citation of sources is mandatory
and must be in the IEEE style.
What to submit:
Submit your report on LMS using the Turnitin link created for Assessment 3. Note that your
Assessment will be checked by Turnitin and you will be provided with a similarity score. This will
be considered when grading the Assessment and the incidents of plagiarism will be penalized
accordingly. If your similarity score is high, you can re-submit your report, but re-submissions are
only allowed until the due date. If you submit your Assessment after the due date, re-submissions
will not be allowed.
Note: All work is due by the due date and time. Late submissions will be penalized at the rate of
10% per day including weekends.
Marking Guide:100 Marks Weightage:20%
| Task | Description | Marks |
| Report Layout and Report Compilation |
The report style, language and structure should beappropriate. |
10 |
| Expected output from the implementation |
Include brief information about the expected output fromthe implementation |
10 |
| Testing criteria | Include the testing criteria you have considered to verify thesuccess of your projectStep by step explanation of how you have tested your system(you can use screenshots as the evidence). |
30 |
| Results | Provide and explain the screenshots of the results you have received in the project. |
30 |
BITS – ITSU3009 9
| Task | Description | Marks |
| Conclusion | Conclude with your opinion about the results. |
10 |
| References | Follow the IEEE style | 10 |
Assessment 4: User Documentation
Objective(s):
This assessment item relates to the unit learning outcomes specifed in the unit descriptor. This assessment
is designed to assess students on how they adopt a systematic approach to produce a quality system and
use their problem-solving skills to solve issues and manage risks during the implementation of a project.
Instructions:
Assessment 4 – User Documentation Report (10% → 2% (Group) + 8% (Individual))
Due Date: Session 12
In this component you need to prepare a user documentation for your project. The user documentation
should be based on the system that you have designed and implemented earlier. In this Assessment, you
will be describing how your prototype operates. Your user document should be easy to understand and not
confusing for the end user.
In the user documentation, you must include the following items in detail:
• Features of your prototype
• How to use the prototype that you have implemented
• How to resolve common problems with your prototype
The report must follow the template provided on the LMS. Please note that citation of sources is mandatory
and must be in the IEEE style.
What to submit:
Submit your report on LMS using the Turnitin link created for Assessment 4. Note that your Assessment will
be checked by Turnitin and you will be provided with a similarity score. This will be considered when grading
the Assessment and the incidents of plagiarism will be penalized accordingly. If your similarity score is high,
you can re-submit your report, but re-submissions are only allowed until the due date. If you submit your
Assessment after the due date, re-submissions will not be allowed.
Note: All work is due by the deadline which is specifed on Moodle. Late submissions will be penalized at the
rate of 10% per day including weekends.
10 BITS – ITSU3009
Marking Guide:100 Marks Weightage:10%
| Task | Description | Marks | |
| Report Layout and Report Compilation |
The report style, language and structure should be appropriate. All assessments need to be compiled together and all references should be included. All fgures and tables need to be caption and the template provided needs to be followed. |
15 | |
| Appendix 1 | Features | Include explanations and if possible, screenshots of main features of the system and how they could be used |
20 |
| User Guide | |||
| Include a step-by-step guide explaining how end users could use your system |
|||
| 20 | |||
| Troubleshooting | |||
| Include explanations of error messages and troubleshooting guides |
|||
| 20 | |||
| Appendix 2 | Response to the comments and feedback including page numbers where the changes have been made. |
10 | |
| References | Follow the IEEE style | 15 |
BITS – ITSU3009 11
INTRODUCTION TO THE INTERNSHIP:
The 3rd Year Project units aim to impart real world project experience to our BITS students. Each of these
projects, named Project 1 and Project 2 are semester long. Project 1 aims to prepare the students in project
planning and design aspects while Project 2 aims to provide implementation and real world experiences.
Typically, students are expected to carry out Project 1 scoping in-house at VIT and Project 2 is expected
to be of an internship nature (i.e., an industrial attachment). In special cases or due to operational
constraints, certain students may carry out both the Projects in-house at VIT or may carry out both the
Projects as internship.
Internship Final Project Report
Marking Guide (Weightage: 70%)
| Task | Description | Marks |
| Introduction | 1) About the organisation 2) Team details 3) Roles and responsibilities 4) Work schedule 5) Managers and leadership reported 6) Report layout |
20 |
| Project details | 1) Project defnition 2) Project design with technical drawings 3) Implementation with photos/screenshots |
30 |
| Project management | 1) Scope management 2) Timeline 3) Risks management |
10 |
| References | Follow the IEEE style | 5 |
| Appendix | 1) Coding samples 2) Confguration fles |
5 |
12 BITS – ITSU3009
Final Oral Presentation and Demonstration
Internship Final Project Report Marking Guide( Weightage: 30%)
Project title: ______________________________________________________________________________
Group No: _______________________________________________________________________________
Evaluator: _______________________________________________Date: ___________________________
Evaluation (Scale: 5 = Professional; 4 = Profcient; 3 = Developing; 2 = Marginal; 1 = Weak; 0 = Novice)
| Speaker 1 | Speaker 2 | Speaker 3 | Speaker 4 | Speaker 5 | Speaker 6 |
| StudentID/ Name |
|||||
| Evaluation | |||||
| PRESENTATION CONTENT | |||||
| Overview of the Project |
|||||
| Technical Design and Implementation |
|||||
| Questions and Answers |
|||||
| PRESENTATION CONTENT | |||||
| Time management |
|||||
| Clarity/Flow | |||||
| Total marks (to be calculated by coordinator) |
|||||
| Grade (to be graded by coordinator) |
BITS – ITSU3009 13
| Learning Outcome Number | Learning Outcome |
| LO1 | Apply project management principles and devel op and deliver a project that meets the specifed requirements. |
| LO2 | Adopt a systematic and professional approach to the production of quality systems. |
| LO3 | Communicate effectively and work productively individually and as part of a team. |
| LO4 | Use problem solving techniques to effectively solve issues that may emerge and to identify and manage risks within the project. |
| LO5 | Reflect critically on the social, ethical and professional obligations in designing, maintaining or advising |
© Copyright VIT (Victorian Institute of Technology) 2019-2020
RTO No: 20829 | TEQSA Provider ID: PRV 14007 | CRICOS Provider Code: 02044E | ABN: 41 085 128 525